Since 1992, Seaway Heavy Lifting built broad and respectable experience in the Oil & Gas market with (amongst others) monopile, jacket and topside installations. We operate the monohull vessel Stanislav Yudin which, with a revolving lift capacity of 2,500 mT, is perfectly suited for the installation of topsides (OHVS stations) and different types of windmill foundations like monopiles, jackets, tripods and gravity based structures.
The Stanislav Yudin is able to work offshore under harsh conditions. To optimise the installation, structures are transported to the Stanislav Yudin, which can store them temporarily on its large available deck. By working alongside the client's designers at an early stage in the project, we aim to develop the most practical and economic offshore foundation concept based on an as installed cost bases.


SHL offshore wind cases

Project                  Greater Gabbard               
Scope                    Install 140 monopiles                        Weight (mT)         519 – 676

Project                  Greater Gabbard
Scope                    install jacket & OHVS station      
Weight (mT)         Jacket: 767 / Topside: 2,069

Project                  Greater Gabbard (Galloper)
Scope                    install jacket & OHVS station
Weight (mT)         Jacket: 755 / Topside: 1,900

Project                  Thanet
Scope                    install jacket & OHVS station          
Weight (mT)         Jacket: 695 / Topside: 1,154