Anholt Transformer Topsides

Back to overview



Scope Transformer topside installation
Client Energinet DK
Dimensions
Topside weight  (Max. module weight)
1700Mt
Dimensions (l x b x h) (37.5x23.4x13)

Waterdepth 16m (LAT)
Fabrication Bladt Industries a/s Aalborg
Installation
Period April 2012
Offshore Installation
Duration/Speed 10 hours