Seaway Heavy Lifting, part of Subsea 7 Renewables & Heavy Lifting Business Unit, is awarded the sizeable contract for the transport and installation of 90 WTG foundations and two offshore substations  Read more
Our highly skilled and motivated on- and offshore professionals are passionate to work on detailed, effective and maximum added value solutions.
We in-house operate high quality fulfilment equipment like hammers, upending tools, generators and ILT’s in order to work as efficient as possible.

Clipper South Platform

Back to overview



ScopeTransport and installation of jacket, piles and deck
ClientRWE Dea UK SNS Ltd
Dimensions
Topside weight
1820Mt
Dimensions (l x b x h) (44x37x22)
Jacket weight 1100Mt
Dimensions
Pile dimensions
4 skirt piles
Pile weight
145/each
Pile length
55.5m
Pile diameter
72in


Waterdepth 23.7m (LAT)
Fabrication HFG Vlissingen
Installation
Period SY 13th/17th August, 2011
OS 26th/28th August, 2011
Offshore Installation SY 115 hours
Duration/Speed OS 53 hours