Seaway Heavy Lifting, part of Subsea 7 Renewables & Heavy Lifting Business Unit, is awarded the sizeable contract for the transport and installation of 90 WTG foundations and two offshore substations  Read more
Our highly skilled and motivated on- and offshore professionals are passionate to work on detailed, effective and maximum added value solutions.
We in-house operate high quality fulfilment equipment like hammers, upending tools, generators and ILT’s in order to work as efficient as possible.

Greater Gabbard Monopiles

Back to overview



Key features:

  • Highest offshore workability
  • Safe, reliable and proven installation solution
  • Full flexibility, capable of maintaining project schedule
  • Well suited for purpose
  • Crane and deck capacity significantly improve safe and efficient handling
Scope

Transport and installation of 140 monopiles

Client Fluor Ltd.
Dimensions
Pile weight
676Mt 
Pile length
67.7m
Pile diameter
6.3m
Pile penetration

35m (approximately) 


Waterdepth 22.4m (LAT)
Fabrication China
Delivery PointFlushing, The Netherlands 
Period June 2010
Offshore Installation Winter 2009 / Summer 2010
Duration Three piles in 2 days